Northwest Indiana Steel Mill Number 8 Boiler Outage
During the Number 8 Boiler Outage at a northwest Indiana steel mill, BMWC removed and replaced 864 hot side generation bank tubes, 67 primary and secondary superheat pendant assemblies, and 5,680 air heater tubes. Our team also installed new valves and upgraded the piping systems to meet the latest standards and improve performance. Completed 60,000 <a href="https://www.bmwc.com/what-we-do/featured-projects/cleveland-cliffs-number-8-boiler-outage/" class="more-link">...<span class="screen-reader-text"> Northwest Indiana Steel Mill Number 8 Boiler Outage</span></a>